Completed Fitness for Service Evaluation in Lieu of Internal Entry for Ten Pressure Vessels Resulting in Documented Savings of $14,000,000 at total Plant Turnaround.

  • 2012 for Commercial Gas Fractionation Plant Assisted with Heat Exchanger Failure Investigation, and Implementation of Risk Based Strategy for Testing Frequency of Safety Relief Valves.
  • 2012, for NASA Stennis Air Force Base (as Subcontractor to Jacobs), Audited Facility Implementation of Risk Based Inspection Program and use of Lloyds Capstone RBMI Software.
  • 2011, for Major Pipeline and Natural Gas Producer in Mid-America Developed Risk Based Mechanical Integrity and Inspection and Testing Procedures along with Document Management Program for Transition to New RBI Software.
  • 2010, for 80K BPD Refinery in Kansas, Competed Risk Based Mechanical Integrity and Inspection Program, Including Implementation Procedures and Field Baseline Inspections.
  • 2009, for Refinery in Kansas, Developed and Implemented Management System for Integration of Mechanical Integrity Assessment into the Process Hazard Analysis for the Plant.
  • 2009, NASA Johnson Space Center, Updated Risk Based Inspection Analysis for Fixed Equipment at the Center, Ensured the Analysis Complied with Government Risk Analysis for Fixed Equipment.
  • 2009, for Large Gas Fractionation Plant, Updated Existing Risk Based Inspection Program with Data Entry and Quality Control; Upgraded Plant Procedures to Present.
  • 2007, for Large Refinery in the United States, Developed and Managed Plant-wide Quality. Control Program for Refinery That Ensured Leak Free Return to Service Following total Plant Turnaround, Involved over 500 Major Equipment Flange Joints.
  • 2007, for One of the Largest Refineries in the United States, Conducted a Plant Specific Seminar on Bolted Flange Leak Reduction and Management for 20 Managers and Engineers.
  • 2006, for Refinery in Kansas, Developed Turnaround Inspection Plans and Basis for Either Conducting or Deferring Inspections for about 300 Items With-out Plans Prior to Turnaround.
  • 2004, for Fertilizer Plant, Developed Life Extension Plan for Boiler.
  • 2005, for NASA Stennis Air Force Base (as Subcontractor to Jacobs), Trained Personnel in the Basics of How to Implement a Risk Based Inspection Program.
  • 2003, For Major Refinery Customer, Conducted Fitness for Service Analysis Into Localized Thinning Of Heat Exchangers.
  • 2006, Conducted Bolted Joint Leak Reduction Seminar for Thirty-five Experienced Managers and Engineers.
  • 2004, for Four Offshore Deep-water Drilling Platforms, Developed Baseline Risk Based Inspection Program.
  • 2004, for Major Deep-water Drilling Company, Conducted Failure Analysis and Investigation into Malfunction and of Structural Flange Joints on Deepwater Thruster Assemblies.
  • 2004, for Major South American Customer Conducted Mechanical Integrity Training and Process Safety Training for Non-English Speaking Professionals.